Place of Origin: | Suzhou, China |
---|---|
Brand Name: | Ruilun |
Certification: | CE & ISO9001 |
Model Number: | DWT |
Minimum Order Quantity: | 100 pcs |
Price: | Negotiable |
Packaging Details: | Cartons and Then packed into pallets |
Delivery Time: | 10-18 working days |
Payment Terms: | T/T, D/A |
Supply Ability: | 5000 pcs/ Week |
Product Name: | 6" Double Wall Insulation Tee With Cap | Material: | Stainless 304(1.4301) / 316L (1.4404) |
---|---|---|---|
Thickness: | 0.5 Mm | Color: | Stainless Pure Silver Color Or Can Be Black Paint |
Bear Temperature: | More Than 600 °C | Packing: | Cartons And Pallets Loading |
Apply To: | Wood Burning Stoves/ Heater/Fireplace/ Multi Fuel Stoves.. | Standard: | EN1856-1 / ISO9001 |
High Light: | 6" Double Wall Chimney Pipe,6 inch Double Wall Chimney Pipe,EN 1.4301 twin Wall Chimney Pipe |
6" Inner Diameter Class A Chimney Pipe Double Wall Insulation Tee With Cap
1. Production Description:
Located as the base of the chimney, this tee can be installed on the interior or the exterior of the structure.
Tee features a deep bottom reservoir, which means you DO NOT need an extra section of the pipe when using a tee support assembly to attach
the tee cover.
No more screws stripping out on the tee cover making cleaning and inspection a breeze!
Product Name: | 6" Double Wall Insulation Tee With Cap |
Series: | Twin wall insulated / Double Wall insulated |
Material: | Stainless 304(1.4301) / 316L (1.4404) |
Color: | This system is shiny stainless silver color |
Size: | 5'' (ID125mm/OD175mm) & 6'' ( ID150mm/OD200mm) |
Thickness: | 0.5mm (+/-0.04mm) suit for National steel standard |
Insulation: | High-density ceramic fibers insulation |
Certificate: | CE, ISO9001 |
Packing size: | Depend on the size of the product |
Weight: | 0.5KG-4KG |
Application: | Wood fireplaces, Pellet stove, Fireplaces, Boiler, Generator, Wood Heater |
2. Related products pictures:
3. Packing and Delivery:
Packing details: Products packed with plastic bags and then into carton then packed into pallets.
Loading port: Shanghai Or Ningbo.
Lead Time: 28 working days after confirming the order.
4. Why Choose us?
(1) We are the manufacturer and supply OEM/ODM. Based on the customer's requirements and need.
(2) We are professional metal products and chimney systems which have more than 10 years of abundant experience in this industry.
(3) We always help customers solve problems and insist on a win-win philosophy.
5. FAQ:
(1) Are you the trading company or the manufacturer?
We are the Manufacturer
(2) What are your payment terms?
T/T: 30% TT deposit and 70% TT balance See B/L loading or Before shipping
(3) How long is your lead time?
20 days after received the deposit.