Place of Origin: | Suzhou, China |
---|---|
Brand Name: | Ruilun |
Certification: | CE & ISO9001 |
Model Number: | SW |
Minimum Order Quantity: | 100 pcs |
Price: | Negotiable |
Packaging Details: | Cartons and Then packed into pallets |
Delivery Time: | 10-30 working days |
Payment Terms: | T/T, D/A |
Supply Ability: | 3000 pcs / Week |
Product Name: | Tower-shaped Rain Caps | Material: | SUS304 / SUS316 / Galvanized |
---|---|---|---|
Size: | Diameter 100mm - 450mm | Thickness: | 0.45mm-1.2mm |
Color: | Silver & Black Powder Coating | Packing: | Cartons And Pallets |
Apply To: | Wood Stove, Fireplace, Boiler, Wood Heater | Standard: | EN1856-2 / ISO9001 |
High Light: | wood stove pipe rain cap,chimney rain cover |
Tower-shaped Rain Caps Stainless Steel Material Weather Resistant Unique appearance
1. Production Description:
Anti downdraught (without the worry of moving parts)
Regulates draw (maintains an even airflow in high or low winds)
Provides optimum burning conditions (increased efficiency and reduced pollution)
Acts as a rain and bird guard
Easy fixing to your chimney pot or twin wall flue without the need for cement
Use this version on appliances fired solid fuel or oil. Also suited for ventilation purposes
Easy installation and a hinged top for easy access makes the Windkat a firm favourite with chimney sweeps
Made from high grade stainless steel with no moving parts to wear out
Product Name: | Tower-shaped Rain Caps |
Series: | Spigot and with locking band connection |
Material: | SUS304 / SUS316 / Galvanized |
Color: | Silver & Black Powder Coating |
Size: | 5", 6", 7", 8", 10", 12", 14'' |
Thickness: | 0.45mm-1.2mm |
Insulation: | No Insulation |
Certificate: | CE, ISO9001 |
Packing size: | Depend on the size of the product |
Weight: | 0.5KG-4KG |
Application: | Wood fireplaces, Pellet stove, Fireplaces, Boiler, Generator, Wood Heater |
2. Related products pictures :
We have a massive range of chimney cowls in stock.
These cowls are suitable for the chimney system of Wood fireplaces, Pellet stove, Fireplaces, Boiler, Generator, Wood Heater.
3. Packing and Delivery:
Packing details: Products packed with plastic bags and then into carton then packed into pallets.
Loading port: Shanghai Or Ningbo.
Lead Time: 22 working days after received the deposit.
4. Why Choose us?
5. FAQ:
(1) Are you the trading company or the manufacturer?
We are the Manufacturer.
(2) What are your payment terms?
T/T: 30% TT deposit and 70% TT balance See B/L loading or Before shipping.
(3) How long is your lead time?
20 days after received the deposit.