products

Fireplace Black Twin Wall Flue Pipe Snap Lock Assembly Economical Design

Basic Information
Place of Origin: Suzhou, China
Brand Name: Ruilun
Certification: CE & ISO9001
Model Number: DWT
Minimum Order Quantity: 80 pcs
Price: USD 5-40 /pc(Negotiable)
Packaging Details: Cartons and Then packed into pallets
Delivery Time: 10-15 working days
Payment Terms: T/T, D/A
Supply Ability: 3000 pcs/ Week
Detail Information
Material:: SUS304 / SUS316 / Galvanized Thickness:: 0.45mm-1.2mm
Size:: Diameter 80mm - 350mm Style Of Connection:: Twist And Locking
Color:: Silver & Black Powder Coating Packing:: Cartons And Pallets
Apply To:: Wood Stove, Fireplace, Boiler, Wood Heater Standard:: EN1856-2 / ISO9001
High Light:

black pellet stove pipe

,

black twin wall flue pipe


Product Description

1. Production Description:

 

 

Product Name: Double wall stainless chimney flues 
Series: Double wall system, twist and with locking band connection
Material: SUS304,SUS316L,SUS430
Color: Black powder coated, 
Size: 5", 6", 7", 8", 10", 12", 14'' 
Thickness: 0.5mm,0.8mm,1.0mm
Insulation: No Insulation
Certificate: CE, ISO9001
Packing size: Depend on the products size  
Weight: 0.5KG-4KG 
Application: Wood fireplaces, Pellet stove, Fireplaces, Boiler, Generator, Wood Heater

 

 

2. Related products pictures :

 

Fireplace Black Twin Wall Flue Pipe Snap Lock Assembly Economical Design 0Fireplace Black Twin Wall Flue Pipe Snap Lock Assembly Economical Design 1Fireplace Black Twin Wall Flue Pipe Snap Lock Assembly Economical Design 2Fireplace Black Twin Wall Flue Pipe Snap Lock Assembly Economical Design 3Fireplace Black Twin Wall Flue Pipe Snap Lock Assembly Economical Design 4Fireplace Black Twin Wall Flue Pipe Snap Lock Assembly Economical Design 5

 

3. Packing and Delivery:

 

 Packing details:  Products packed with plastic bags and then into carton then packed into pallets.

 

 Loading port:  Shanghai Or Ningbo.

 

 Lead Time:   22 working days after confirm the order.

 

 

4. Why Choose us ?

  1. We are Manufacturer and supply OEM/ODM. Based on customer's requirements and need. 
  2. We are professional metal products and chimney systems which have more than 10 years abundant experience in this industry.
  3. We always help customers solver the problems and insist win-win philosophy.

5. FAQ: 

  1. Are you the trade company or the manufacturer?

We are the Manufacturer.

 

  1. What is your payment terms?

T/T : 30% TT deposit and 70% TT balance See B/L loading or Before shipping.

 

  1. How long is your lead time?

20 days after received the deposit.  

 

Contact Details
eric

Phone Number : +86-13812610917

WhatsApp : +8613812610917